Call Us

+86-15201969650

Get Location

No.5358 Huyi Road, Jiading District, Shanghai, China

News

Technical requirements for KBK rail crane

“ 1. Cooling Thermal insulation measures shall be taken for the cab of the crane working under high temperature for a long time. Cooling measures shall be taken for electric control equipment. Fans and power sockets shall be installed in the cab. 2. Keep warm, According to the environmental condi”

1. Cooling
Thermal insulation measures shall be taken for the cab of the crane working under high temperature for a long time. Cooling measures shall be taken for electric control equipment. Fans and power sockets shall be installed in the cab.
2. Keep warm,
According to the environmental conditions and the requirements of users, when heating equipment is set, the fixed protection mode non luminous heater shall be used, and the electric heater shall use three-phase power supply as much as possible.
3. Special requirements
The design and selection of crane electrical equipment used in special environment and working conditions (such as outdoor, high temperature, wet tropical zone, dry tropical zone, explosive dangerous medium, corrosive medium, etc.) shall meet the corresponding requirements.

RELATED PRODUCTS

KBK Aluminum Workstation Lifting System

KBK Aluminum Workstation Lifting System

KBK aluminum workstation crane supports flexible combination and expansion, meeting material handling requirements for multi-station production lines and flexible manufacturing environments.

Stainless Steel Mobile Gantry Cranes

Stainless Steel Mobile Gantry Cranes

High quality stainless steel mobile gantry cranes feature excellent corrosion resistance and flexible movable structure, meeting the safe and efficient handling requirements of cleanroom applications.

KBK Flexible Double Girder Suspension Crane

KBK Flexible Double Girder Suspension Crane

The KBK double girder suspension crane is a workstation lifting solution, features lightweight rails and double-girder structure, achieve stable load handling and flexible layout configuration.

RELATED CASES